Iron Bear Project

Overview

Iron Bear Resources owns and operates the Iron Bear magnetite iron ore project, formerly known as the Block 103 Project.

The Iron Bear Project consists of eleven licenses totaling 11,000 ha on 441 graticular Mineral Claims under the applicable Labrador and Newfoundland mining regulation, located near the Provincial border of Newfoundland and Labrador (NL) and Quebec (QC), approximately 30 km northwest of the town of Schefferville, QC and 1,200 km by air northeast of Montréal, QC.

The Labrador Trough has supported iron ore mining operations since 1954. Rio Tinto (IOC), Arcelor Mittal (Mount Wright) Champion Iron (Bloom Lake and Kami), Tecora and Tata Steel are currently producing iron ore in the Labrador trough, in aggregate approximately 50 Mt p.a.

The Iron Bear properties are located within 25 km of an open access heavy haul railway which is directly connected to the Sept Isles and Pointe Noire iron ore export ports. In addition, the Iron Bear has potential access to cheap renewable energy from the Menihek hydro-plant located 75km away. These two factors substantially improve the prospects for eventual economic extraction of the Iron Bear mineral resource.

The Iron Bear project area is connected by a road to the town of Schefferville which is connected to a heavy haul iron ore open access railway connected to Sept Isles and Pointe Noire which are both open access iron ore export ports. Schefferville has a small airport with daily flights to Sept Isles and then to Quebec City and Montreal.

Mineral Assets

Iron Ore

IBR

100%

World Class Iron Ore Project

Mineral resource of 16.6 billion tonnes containing 29.3% total Fe and 18.2% magnetic Fe, cut-off grade 12.5% magnetic Fe.

Low OPEX

Estimated OPEX of USD46/t FOB Pointe Noire for blast furnace concentrate due to access to low-cost hydropower

Strategic Tier 1 Asset

Iron ore asset with flexible development scenarios and the potential to ramp up production to over 100 Mta

Mining Friendly Jurisdiction and Proximity to Infrastructure

Iron Bear located in Canada, less than 25km from an open access heavy haul railway with proximity to low cost to hydro-power

High Quality
Product

Production of high quality magnetite concentrate grading 71.0% Fe and 1.2% SiO2 in industrial pilot plant

Fast Track Project
Development

Underpinned by the supply of bulk samples of DR and BF concentrates to mill clients in Q2 2024